Back

Pre/Post Change Validation Sheet

Live Now: capture pre-change baselines and post-change outcomes in one printable validation sheet.

UK format guidance: use DD/MM/YYYY for dates and include ticket references in notes/evidence.

Total Checks
0
Pass
0
Review
0
Fail
0
Critical Category Validation Check Method Pre Status Post Status Result Evidence / Notes Owner Action

Result logic: Pass = pre and post align or post improved; Review = one side N/A or Unknown; Fail = regression or any failed post check.

Tip: paste summary into change ticket closure notes.